I shifted work inside - the porch attic.
Ran wire up the corner into the small attic above the porch and down through the block to switch cutouts I put in the block.
Here's a view of the wires going into the wall.
It is hard to fish wire through block. I'm changing plans to minimize doing this. It's a pain.
I'll run the hot wire to the fixtures and then one wire to each switch. That will require only fishing one more wire vs. three more. I'll use a fixture as a junction as well.
Got some nice comments from neighbors on the chimney at the party next door this evening too.
Craig called this afternoon.
He may come tomorrow to clean up and finis the knee walls.
It was good to get an update.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.